8. Pradhan Mantri Gram Sadak Yojana (PMGSY) Pl. click here for GOI Guidelines
Pl. click here for all G.Os

        Pradhan Mantri Gram Sadak Yojana was launched in 2000 to provide all weather road access to unconnected habitations. PMGSY is a 100% centrally sponsored scheme. From 2015-16 onwards, the funding pattern has been revised to 60% Central share and 40% State Share. The programme objective is to provide round-the–year connectivity by all weather roads with necessary culverts and cross drainage structures.

        In Tamil Nadu, all habitations with more than 1000 population have been provided connectivity and 99 % of unconnected habitations with population range 500 – 999 have been provided connectivity. The remaining habitations could not be provided connectivity due to various reasons like Reserve Forest area, non-availability of land etc.

PMGSY Phase I to VII

Sl. No

Phase

Year

Taken up

Nos

Length (in Km)

Value Rs in crore)

1.

I

2000-01

862

1442.123

152.911

2.

II

2001-02

444

795.088

114.265

3.

III

2003-04

491

1096.398

159.072

4.

IV

2004-05

393

778.310

111.354

5.

V

2005-06

365

799.592

170.838

6.

VI

2006-07

810

2049.019

459.819

7.

VII

2007-08

1581

3010.324

853.720

8.

VIII

2012-13

1340

3090.930

1128.74

9.

IX

2014-15

407

956.030

357.12

10.

X

2016-17

605

1366.79

758.44

Total

7298

15384.604

4266.28

8.1 Proposals sanctioned under PMGSY Phase VIII (2012-13)
        After a gap of 4 years, due to the sustained efforts of the State Government, the Government of India, Ministry of Rural Development has recently sanctioned proposals under PMGSY Phase-VIII as detailed below:

8.1.1 New Connectivity (500-999 category)
        40 road works providing connectivity to 41 unconnected habitations for a length of 90.03 Km, at a total cost of Rs.39.01 crore have been sanctioned.

8.1.2 Upgradation
         Based on the pavement condition, upgradation of 1255 roads for a length of 3000.97 Km at a total cost of Rs.1011.55 crore has been taken up..

8.1.3 Long Span Bridges
        In order to ensure uninterrupted connectivity throughout the year, 45 long span bridges at a total cost of Rs.78.18 crore has been taken up. 

8.1.4 Roads using New Technology  
        As an innovative technological intervention, the Government of India has accorded approval under PMGSY

Sl. No

Details

No of works

Length of road (in Km) Value of work(Rs in crore)

1.

Roads- using coir-geo textile

18

40.931

16.40

2.

Roads-using RBI grade 81

7

16.505

5.71

Total

25

57.436

22.11

Totally 1,340 road and bridge works for a length of 3091 Km at a cost Rs.1128.74 crore have been taken up. This includes Rs.254.76 crore as State share.

This Government has also allocated Rs.66.84 crore for routine maintenance of these works for 5 years.


8.2 Proposals sanctioned under PMGSY Phase IX (2014-15)
8.2.1 Upgradation
        Based on the pavement condition, upgradation of 401 roads for a length of 956.03 Km at a total cost of Rs.348.90 crore has been taken up.

8.2.2 Long Span Bridges
        In order to ensure uninterrupted connectivity throughout the year, 6 long span bridges at a total cost of Rs.8.22 crore has been taken up.


8.2.3 Roads using New Technology
        As an innovative technological intervention, the Government of India has accorded approval under PMGSY .
Sl. No

Details

No of works

Length of road (in Km) Value of work(Rs in crore)

1.

Roads- using Plastic waste

40

180.06

64.707

2.

Roads-using RBI grade 81

5

10.20

8.69

3.

Roads-using Cement stabilization

5

10.20

4.13

Total

50

201.11

77.53

Totally 407 road and bridge works for a length of 956.03 Km at a cost Rs.357.12 crore have been taken up. This includes Rs.160.72 crore as State share.

This Government has also allocated Rs.24.16 crore for routine maintenance of these works for 5 years.

8.3 Proposals sanctioned under PMGSY Phase X (2016-17)

8.3.1 New Connectivity (500-999 category)

3 road works providing connectivity to 3 unconnected habitations for a length of 40.46 Km, at a total cost of Rs.36.02 crore have been sanctioned.

8.3.2 Upgradation

Based on the pavement condition, upgradation of 580 roads for a length of 1326.33 Km at a total cost of Rs.671.47 crore has been taken up.

8.3.3 Long Span Bridges

In order to ensure uninterrupted connectivity throughout the year, 22 long span bridges at a total cost of Rs.50.98 crore has been taken up.

8.3.4 Roads using New Technology

As an innovative technological intervention, the Government of India has accorded approval under PMGSY

Sl. No

Details

No of works

Length of road (in Km) Value of work(Rs in crore)

1.

Roads- using Plastic waste

15

63.37

26.84

2.

Roads-usingRBI grade 81

8

24.953

17.49

3.

Roads-usingCement stabilization

5

12.489

6.42

4.

Barrium Carbide Waste

2

2.145

2.37

5.

CC Block

2

2.952

1.33

6.

Cold Mix

15

84.861

64.46

7.

Steel slag

1

1.74

0.72

8.

RCCP

2

2.50

1.40

9.

Terrazyme

15

32.796

20.54

10.

Nano Technology

31

72.681

69.00

11.

Zycosoil

5

10.97

6.15

Total

101

311.46

216.72

Totally 605 road and bridge works for a length of 1366.79 Km at a cost Rs.758.44 crore have been taken up. This includes Rs.341.11 crore as State share.

This Government has also allocated Rs.50.54 crore for routine maintenance of these works for 5 years.

District wise Details of works to be taken up under PMGSY Phase X (2016-17)

Sl. No

District

No of works taken up

Length (in Km)

Amount (Rs. in Crore)

1.

Coimbatore 18 21.16 1721.38

2.

Cuddalore  5 13.316 556.17

3.

Dharmapuri 22 36.28 2934.47

4.

Dindigul  24 69.97 2609.42

5.

Erode 17 34.381 2031.99

6.

Kancheepuram  3 6.1 176.87

7.

Karur 11 48.955 1665.73

8.

Krishnagiri 9 19.395 1432.84

9.

Madurai 30 66.453 2582.42

10.

Nagapattinam 110 200.144 13801.08

11.

Namakkal 11 46.685 3894.51

12.

Perambalur 19 42.97 2939.81

13.

Pudhukottai 44 104.252 5978.54

14.

Ramnad  35 92.995 4078.06

15.

Salem 23 59.963 2976.66

16.

Sivagangai  6 17.43 675.61

17

Thanjavur 11 23.601 1236.5

18.

The Nilgiris 3 4.85 550.3

19.

Theni  1 5.46 550

20.

Tiruchirappalli 26 66.185 2642.12

21.

Tirunelveli  3 10.175 333.15

22.

Tiruppur  12 25.16 999.07

23.

Tiruvallur 6 12.3 620.35

24.

Tiruvannamalai   18 32.729 1053.99

25.

Tiruvarur 39 80.145 8701.57

26.

Tuticorin 7 25.998 1082.55

27.

Vellore 18 37.093 1232.15

28.

Villupuram 41 81.25 3567.82

29.

Virudhunagar  33 81.402 3219.21

Total

605

1366.797

75844.34