Pradhan Mantri Gram Sadak Yojana was launched in 2000 to provide all weather road access to unconnected habitations. PMGSY is a 100% centrally sponsored scheme. From 2015-16 onwards, the funding pattern has been revised to 60% Central share and 40% State Share. The programme objective is to provide round-the–year connectivity by all weather roads with necessary culverts and cross drainage structures.
In Tamil Nadu, all habitations with more than 1000 population have been provided connectivity and 99 % of unconnected habitations with population range 500 – 999 have been provided connectivity. The remaining habitations could not be provided connectivity due to various reasons like Reserve Forest area, non-availability of land etc.
PMGSY Phase I to VII
Sl. No |
Phase |
Year |
Taken up |
Nos |
Length (in Km) |
Value Rs in crore) |
1. |
I |
2000-01 |
862 |
1442.123 |
152.911 |
2. |
II |
2001-02 |
444 |
795.088 |
114.265 |
3. |
III |
2003-04 |
491 |
1096.398 |
159.072 |
4. |
IV |
2004-05 |
393 |
778.310 |
111.354 |
5. |
V |
2005-06 |
365 |
799.592 |
170.838 |
6. |
VI |
2006-07 |
810 |
2049.019 |
459.819 |
7. |
VII |
2007-08 |
1581 |
3010.324 |
853.720 |
8. |
VIII |
2012-13 |
1340 |
3090.930 |
1128.74 |
9. |
IX |
2014-15 |
407 |
956.030 |
357.12 |
10. |
X |
2016-17 |
605 |
1366.79 |
758.44 |
Total |
7298 |
15384.604 |
4266.28 |
8.1 Proposals sanctioned under PMGSY Phase VIII (2012-13)
After a gap of 4 years, due to the sustained efforts of the State Government, the Government of India, Ministry of Rural Development has recently sanctioned proposals under PMGSY Phase-VIII as detailed below:
8.1.1 New Connectivity (500-999 category)
40 road works providing connectivity to 41 unconnected habitations for a length of 90.03 Km, at a total cost of Rs.39.01 crore have been sanctioned.
8.1.2 Upgradation
Based on the pavement condition, upgradation of 1255 roads for a length of 3000.97 Km at a total cost of Rs.1011.55 crore has been taken up..
8.1.3 Long Span Bridges
In order to ensure uninterrupted connectivity throughout the year, 45 long span bridges at a total cost of Rs.78.18 crore has been taken up.
8.1.4 Roads using New Technology
As an innovative technological intervention, the Government of India has accorded approval under PMGSY
Sl. No |
Details |
No of works |
Length of road (in Km) |
Value of work(Rs in crore) |
1. |
Roads- using coir-geo textile |
18 |
40.931 |
16.40 |
2. |
Roads-using RBI grade 81 |
7 |
16.505 |
5.71 |
Total |
25 |
57.436 |
22.11 |
Totally 1,340 road and bridge works for a length of 3091 Km at a cost Rs.1128.74 crore have been taken up. This includes Rs.254.76 crore as State share.
This Government has also allocated Rs.66.84 crore for routine maintenance of these works for 5 years.
8.2 Proposals sanctioned under PMGSY Phase IX (2014-15)
8.2.1 Upgradation
Based on the pavement condition, upgradation of 401 roads for a length of 956.03 Km at a total cost of Rs.348.90 crore has been taken up.
8.2.2 Long Span Bridges
In order to ensure uninterrupted connectivity throughout the year, 6 long span bridges at a total cost of Rs.8.22 crore has been taken up.
8.2.3 Roads using New Technology
As an innovative technological intervention, the Government of India has accorded approval under PMGSY .
Sl. No |
Details |
No of works |
Length of road (in Km) |
Value of work(Rs in crore) |
1. |
Roads- using Plastic waste |
40 |
180.06 |
64.707 |
2. |
Roads-using RBI grade 81 |
5 |
10.20 |
8.69 |
3. |
Roads-using Cement stabilization |
5 |
10.20 |
4.13 |
Total |
50 |
201.11 |
77.53 |
Totally 407 road and bridge works for a length of 956.03 Km at a cost Rs.357.12 crore have been taken up. This includes Rs.160.72 crore as State share.
This Government has also allocated Rs.24.16 crore for routine maintenance of these works for 5 years.
8.3 Proposals sanctioned under PMGSY Phase X (2016-17)
8.3.1 New Connectivity (500-999 category)
3 road works providing connectivity to 3 unconnected habitations for a length of 40.46 Km, at a total cost of Rs.36.02 crore have been sanctioned.
8.3.2 Upgradation
Based on the pavement condition, upgradation of 580 roads for a length of 1326.33 Km at a total cost of Rs.671.47 crore has been taken up.
8.3.3 Long Span Bridges
In order to ensure uninterrupted connectivity throughout the year, 22 long span bridges at a total cost of Rs.50.98 crore has been taken up.
8.3.4 Roads using New Technology
As an innovative technological intervention, the Government of India has accorded approval under PMGSY
Sl. No |
Details |
No of works |
Length of road (in Km) |
Value of work(Rs in crore) |
1. |
Roads- using Plastic waste |
15 |
63.37 |
26.84 |
2. |
Roads-usingRBI grade 81 |
8 |
24.953 |
17.49 |
3. |
Roads-usingCement stabilization |
5 |
12.489 |
6.42 |
4. |
Barrium Carbide Waste |
2 |
2.145 |
2.37 |
5. |
CC Block |
2 |
2.952 |
1.33 |
6. |
Cold Mix |
15 |
84.861 |
64.46 |
7. |
Steel slag |
1 |
1.74 |
0.72 |
8. |
RCCP |
2 |
2.50 |
1.40 |
9. |
Terrazyme |
15 |
32.796 |
20.54 |
10. |
Nano Technology |
31 |
72.681 |
69.00 |
11. |
Zycosoil |
5 |
10.97 |
6.15 |
Total |
101 |
311.46 |
216.72 |
Totally 605 road and bridge works for a length of 1366.79 Km at a cost Rs.758.44 crore have been taken up. This includes Rs.341.11 crore as State share.
This Government has also allocated Rs.50.54 crore for routine maintenance of these works for 5 years.
District wise Details of works to be taken up under PMGSY Phase X (2016-17)
Sl. No |
District |
No of works taken up |
Length (in Km) |
Amount (Rs. in Crore) |
1. |
Coimbatore |
18 |
21.16 |
1721.38 |
2. |
Cuddalore |
5 |
13.316 |
556.17 |
3. |
Dharmapuri |
22 |
36.28 |
2934.47 |
4. |
Dindigul |
24 |
69.97 |
2609.42 |
5. |
Erode |
17 |
34.381 |
2031.99 |
6. |
Kancheepuram |
3 |
6.1 |
176.87 |
7. |
Karur |
11 |
48.955 |
1665.73 |
8. |
Krishnagiri |
9 |
19.395 |
1432.84 |
9. |
Madurai |
30 |
66.453 |
2582.42 |
10. |
Nagapattinam |
110 |
200.144 |
13801.08 |
11. |
Namakkal |
11 |
46.685 |
3894.51 |
12. |
Perambalur |
19 |
42.97 |
2939.81 |
13. |
Pudhukottai |
44 |
104.252 |
5978.54 |
14. |
Ramnad |
35 |
92.995 |
4078.06 |
15. |
Salem |
23 |
59.963 |
2976.66 |
16. |
Sivagangai |
6 |
17.43 |
675.61 |
17 |
Thanjavur |
11 |
23.601 |
1236.5 |
18. |
The Nilgiris |
3 |
4.85 |
550.3 |
19. |
Theni |
1 |
5.46 |
550 |
20. |
Tiruchirappalli |
26 |
66.185 |
2642.12 |
21. |
Tirunelveli |
3 |
10.175 |
333.15 |
22. |
Tiruppur |
12 |
25.16 |
999.07 |
23. |
Tiruvallur |
6 |
12.3 |
620.35 |
24. |
Tiruvannamalai |
18 |
32.729 |
1053.99 |
25. |
Tiruvarur |
39 |
80.145 |
8701.57 |
26. |
Tuticorin |
7 |
25.998 |
1082.55 |
27. |
Vellore |
18 |
37.093 |
1232.15 |
28. |
Villupuram |
41 |
81.25 |
3567.82 |
29. |
Virudhunagar |
33 |
81.402 |
3219.21 |
Total |
605 |
1366.797 |
75844.34 |
|