14th July, 2025
 Gallery 
 State Level  District Level  Block Level  Village Level 
 Blocks  Technical Sub-divisions 
 Acts, Rules & GOs  Announcements  Citizen Chart  Policy Notes  Reports  Externally Funded Schemes  Model Tender Documents  Type Design Drawings for Buildings  Unit Cost 2014-2015  RTI ACT  VIDEO  Checklist for Various Schemes 
 State Schemes  Central Schemes  Externally Funded Schemes 
 Constitutional Provisions  TN Panchayats Act  TN Panchayats Rules  Status of PRIs  Fund Release Details 
Schemes : State Schemes : Comprehensive School Infrastructure Development Scheme (CSIDS)
4. Comprehensive School Infrastructure Development Scheme (CSIDS) Pl. click here for all G.Os

         This Government has launched the  Comprehensive School Infrastructure Development Scheme (CSIDS) during 2011-12 with an objective of providing basic infrastructure facilities like New Buildings, Kitchen sheds, Water supply, Toilets, etc., in the Panchayat Union Primary and Middle Schools in rural areas.  Repairs and renovation of the existing facilities will also be taken up wherever necessary.

         New school buildings will be constructed with RCC roof with weathering course on the basis of the strength of the students.  The space available in the school premises will be used for the new construction and if adequate space is not available, a new floor will be added to the existing RCC Buildings after assessing the structural stability of the building.

          New kitchen sheds will be taken up in those schools where kitchen sheds are not available and the existing damaged kitchen sheds will be taken up for repair and renovation.  Additional rooms/store rooms may also be constructed for stocking the commodities.

          Existing water supply system in the schools which are in damaged condition will be taken up for repairs.  Extension of pipeline will be provided wherever necessary.  New water supply connection from the Panchayat or a new bore well will also be provided wherever necessary.

          This Government shall ensure that all the Panchayat Union Schools have adequate toilet facilities for girl and boys.  Incinerators will be provided for the benefit of girl students.  If it is felt that funds under Total Sanitation Campaign are insufficient to meet the requirement of new toilets, the toilets can be taken up under the Comprehensive School Infrastructure Development Scheme also.  This scheme is being implemented in the Panchayat Union schools located in Town Panchayats and Grade III Municipalities also.

          As a measure to protect the school environment clean and to make the students safe, compound wall construction was also allowed from 2012-13 onwards.

          Committees have been constituted at the district level to take up a detailed assessment of need based on THAI survey for ascertaining the infrastructural needs of the schools.

4.1 Scheme implementation during    2011-12 & 2012-13

          During 2011-12, an amount of Rs.100 crores has been earmarked.

          For the year 2012-13 also, a sum of Rs.100 crores has been allocated. 

          These basic requirements viz, buildings, kitchen shed, toilets, water supply and compound wall facilities have been extended to all THAI villages of 2011-12(2020 Village panchayats) and 2012-13(2250 village Panchayats) in a comprehensive manner.  Both repair works and new works have been taken up and detailed below:

Sl.No

Category

CSIDS 2011-12

Repair work

New works

Total

No

Amount in lakhs

No

Amount in lakhs

No

Amount in lakhs

1

School Building

1222

914.943

162

1174.930

1384

2089.873

2

Kitchen shed

1398

419.794

1072

2135.213

2470

2555.007

3

Toilets

3515

1339.231

907

1468.654

4422

2807.885

4

Water supply

-

-

2220

1481.288

2220

1418.288

Total

6135

2673.97

4361

6260.09

10496

8934.053


Sl. No

Category

CSIDS 2012-13

Repair work

New works

Total

No

Amount in lakhs

No

Amount in lakhs

No

Amount in lakhs

1

School Building

2058

1671.050

67

450.600

2125

2121.65

2

Kitchen shed

1198

328.864

665

1330.456

1863

1659.32

3

Toilets

2533

999.195

540

837.825

3073

1837.02

4

Water supply

-

-

904

1018.712

904

1018.712

5

Compound wall

-

-

1213

3163.180

1213

3163.18

Total

5789

2999.109

3389

6800.773

9178

9799.882

4.2 Scheme Implementation during  2013-14

          It has been proposed to implement the scheme on the above lines to the tune of Rs.100 Crore for the year 2013-14.

 


  Previous
Next