Schemes : State Schemes : Panchayat Union School Renovation Programme
1.3 Panchayat Union School Renovation Programme Pl. click here for all G.Os

1.3.1 Introduction

The programme of Panchayat Union School Renovation introduced in 2007-08 envisages repair and improvement of all Panchayat Union Elementary Schools and Middle Schools in the State in a phased manner. There are around 22,000 Panchayat Union Primary Schools and 4,500 Panchayat Union Middle Schools which are being maintained by Block Panchayats. Due to lack of proper maintenance, most of these School buildings have become dilapidated. Hence, the repair and renovation of such long neglected school buildings were taken up under this new scheme which was sanctioned vide G.O. Ms. No. 94, Rural Development and Panchayat Raj (SGS4) Department, dt. 12.06.2007.

The detailed guidelines have been issued along with the same Government order. The amendment to guidelines were issued vide Secretary to Government. RD&PR (SGS-1) Dept. Lr.No.40010/SGS-1/07-1 dt. 13.12.2007.

Updated guidelines for implementation of the scheme for 2008 - 09 have been issued vide G.O.(Ms) No. 97 RD&PR (SGS.1) Dept. dt. 06.06.2008. and G.O.(Ms) No. 64 RD&PR (SGS.1) Dept. dt. 16.07.2009.


Panchayat Union Middle School, Paganatham Panchayat, Dindigul District



Pl. click here for Photo Gallery

1.3.2 Brief Guidelines

As per the guidelines, a selection committee consisting of the following members is given the responsibilities for the finalization of the repair works to be carried out in each of the school buildings:
  1. Block Development Officer (Block Panchayat)–Convener of the Committee
  2. Union Engineer
  3. Assistant Elementary Education Officer (AEEO) concerned
  4. Head Master of the Panchayat Union School
  5. Village Panchayat President
  6. Panchayat Union Ward Member Concerned.
In identification by the Committee of the repair works to be carried out, the following order of priority has to be strictly observed:
  1. Minor Works:
    • White washing / Colour washing of the buildings (except those buildings, where white washing / colour washing was done within the last 3 years).
    • Under taking repairs of RCC roof (in terms of putting up weathering course or taking up leak proofing etc.)
    • Repairs / replacement of damaged flooring
    • Painting of Black Boards
    • Repair/ replacement of doors and windows
    • Minor repairs of damaged tiles/rafters/ reapers in buildings with tiled roofing.
    • Repairs of cracks in buildings walls.

  2. Major Works: e.g. Replacement of tiled roofing or Asbestos sheet roofing  by Mangalore tiles

    In respect of such works where replacement of tiled roofing or Asbestos sheet roofing is to be taken up as suggested by the Committee, The Assistant Executive Engineer (RD) concerned has to inspect each and every work and verify the type of work which can be undertaken on site considering the building condition and also the cost involved for that purpose. Such cases are to be dealt with on a case to case basis separately and are to be approved by the District Collectors also separately. Totally dillapidated buildings requiring replacement are not to be taken for repair.

    The works are executed through tendering process. The Block Development Officer (Block Panchayat) is designated as the tender inviting authority.


    1.3.3 Works

    In the year 2007-08, an allocation of Rs. 135 crores have been made for renovation of 10,248 School buildings in AGAMT Village Panchayats of both AGAMT 2006-07 and 2007-08 Villages.

    After inspection by selection committee and engineers, 10150 school buildings have actually been taken up for renovation and repair at an estimated cost of Rs. 102.59 crores in the year 2007-08. The district-wise breakup is given in the Table  1.3.1 and breakup of components of repair is given in the Table 1.3.2:

    In the year 2008-09, an allocation of Rs. 90 crores has been made for renovation of School buildings in 2008-09 AGAMT Villages.

    8,410 school buildings have actually been taken up for renovation and repair at an estimated cost of Rs. 69.69 crores in the year 2008-09.

    In the year 2009-10, an allocation of Rs. 85 crores has been made for renovation of School buildings in 2009-10 AGAMT Villages 7,927 school buildings have actually been taken up for renovation and repair at an estimates exactly Rs. 67.57 crores in the year 2009-10.

Table 1.3.1
District-wise works taken up details
under Panchayat Union School Renovation Program

Sl.No.
Name of the District
2008-2009
2009-2010
2010-2011
No of the School buildings  taken up for renovation
Financial Allocation (Rs.in crores)
No of the School buildings  taken up for renovation
Financial Allocation (Rs.in crores)
No of the School buildings taken up for renovation
Financial Allocation (Rs.in crores)

1

Kancheepuram

306 2.59 291 2.96 180 456.30

2

Tiruvallur

306 3.32 323 3.67 216 542.24

3

Cuddalore

369 3.46 281 2.68 198 435.74

4

Villupuram

573 5.20 498 4.20 279 522.17

5

Vellore

547 4.47 491 4.23 329 742.57

6

Tiruvannamalai

579 4.58 540 4.69 314 612.70

7

Salem

423 4.06 342 3.58 284 744.91

8

Namakkal

226 2.94 248 318 182 546.33

9

Dharmapuri

380 2.28 316 3.31 221 525.91

10

Krishnagiri

425 2.97 408 3.35 300 514.90

11

Erode

366 3.36 255 1.86 210 297.35

12

Coimbatore

313 1.22 188 1.07 159 355.53

13

The Nilgiris

124 1.18 114 1.22 23 64.08

14

Thanjavur

107 1.90 278 1.64 182 285.54

15

Nagapattinam

190 1.57 216 1.51 120 141.45

16

Thiruvarur

188 1.39 152 1.15 104 143.63

17

Trichy

320 2.95 311 3.11 176 414.36

18

Karur

154 1.97 147 1.65 141 337.64

19

Perambalur

79 0.57 91 0.71 38 90.58

20

Ariyalur

169 1.37 127 1.15 117 189.96

21

Pudukottai

434 4.47 366 2.59 251 422.74

22

Madurai

253 1.41 306 2.26 187 303.25

23

Theni

109 0.99 128 1.35 58 202.61

24

Dindigul

364 2.22 275 1.81 230 403.74

25

Ramnathapuram

282 1.83 216 1.29 266 211.34

26

Virudhunagar

213 1.37 195 1.51 147 246.76

27

Sivagangai

254 1.95 253 1.91 232 224.10

28

Tirunelveli

156 0.95 175 1.15 150 229.15

29

Tuticorin

188 0.72 99 0.52 103 107.91

30

Kanyakumari

79 0.43 51 0.26 40 93.80

31

Tripur

0 0 246 1.95 223 451.50

Grand Total

8476 69.69 7927 67.52 5660 10860.79

Table 1.3.2
Components of repair in Panchyat Union School Renovation Program

Sl  No

Components

2007-2008 2008-2009 2009-2010 2010-2011

Taken up

Amount required (Rs.in crores)

Taken up

Amount required (Rs.in crores)

Taken up

Amount required (Rs.in crores)

Taken up

Amount required (Rs.in crores)

1

White /Colour washing of buildings

15784

20.62

8517

13.89

7839

16.16

11303

28.50

2

Undertaking repairs of RCC roofing of builidngs

5769

11.79

3637

8.89

3521

9.65

5739

17.91

3

Repair /Replacement of Damaged  flooring of buildings

7056

4.52

4375

2.94

4125

3.20

5858

5.42

4

Painting of Black Boards of buildings

14654

2.78

8248

1.82

7620

1.65

10946

2.27

5

Repair/Replacement of Doors and Windows

9970

5.44

5719

5.26

5571

5.56

8199

7.90

6

Minor Repairs of damaged tiles/rafters/reapers

2765

2.54

1241

2.10

1059

1.88

1399

3.54

7

Repair of cracks in building walls

5160

1.83

3035

1.07

2591

1.14

4284

2.22

8

Other works of buildings

13136

8.61

8237

5.93

7559

6.58

10360

11.13

9

Complete replacement of tiled roofing  of buildings

677

5.13

446

3.30

395

2.54

714

4.86

10

Conversion of Asbestos roofing in to Mangaloe tiled roofing of buildings

3730

39.33

1919

24.49

1630

19.20

2153

26.69

Total 102.59   69.69   67.57

110.44

The Panchayat Union Elementary and Middle Schools originally located in Village Panchayats which have subsequently been upgraded as Town Panchayats and Third Grade Municipalities are still the assets of the respective Panchayat Unions. Hence, during 2008-09, 463 Panchayat Union Elementary and Middle Schools located in Town Panchayats and Third Grade Municipalities have been taken up for repair and renovation as per G.O.Ms.No.139 RD & PR (SGS.1) Department, dated, 28.08.2008. at an estimated cost of Rs. 14.31 crores.

The district-wise breakup is given in the Table 1.3.3 and breakup of components of repair is given in the Table 1.3.4:

Table 1.3.3

District - wise works taken up details under Panchayat Union School Renovation Program in 2008-09 and 2009-2010 in Panchayat Union Schools located in Town Panchayats and Third Grade Municipalities

Sl.No.
Name of the District
2008-2009
2009-2010
2010-2011
No of the School buildings  taken up for renovation
Financial Allocation (Rs.in crores)
No of the School buildings  taken up for renovation
Financial Allocation (Rs.in crores)
No of the School buildings taken up for renovation
Financial Allocation (Rs.in crores)

1

Kancheepuram

24

0.71

24

0.60

21 51.79

2

Tiruvallur

15

0.64

15

0.52

16 39.91

3

Cuddalore

16

0.54

17

0.43

10 31.40

4

Villupuram

17

0.53

16

0.43

14 24.45

5

Vellore

25

0.75

25

0.54

24 60.38

6

Tiruvannamalai

13

0.42

13

0.30

13 32.51

7

Salem

30

1.20

30

0.86

28 70.29

8

Namakkal

18

0.87

18

0.51

8 33.74

9

Dharmapuri

10

0.31

10

0.42

6 25.39

10

Krishnagiri

7

0.16

7

0.13

16 24.29

11

Erode

43

0.93

31

0.54

30 58.24

12

Coimbatore

40

0.99

25

0.50

22 75.44

13

The Nilgiris

12

0.28

12

0.40

9 31.38

14

Thanjavur

17

0.50

17

0.32

15 22.70

15

Nagapattinam

8

0.19

4

0.05

4 5.43

16

Thiruvarur

6

0.09

6

0.09

5 5.96

17

Trichy

12

0.38

11

0.42

20 69.84

18

Karur

13

0.51

13

0.35

14 33.64

19

Perambalur

3

0.08

3

0.08

0 0

20

Ariyalur

3

0.05

2

0.04

1 3.10

21

Pudukottai

5

0.22

4

0.11

5 3.76

22

Madurai

10

0.39

9

0.17

8 8.38

23

Theni

13

0.95

13

0.62

13 33.64

24

Dindigul

23

0.74

23

0.48

57 72.14

25

Ramnathapuram

9

0.23

7

0.09

6 7.57

26

Virudhunagar

5

0.13

5

0.07

3 3.36

27

Sivagangai

8

0.10

8

0.11

6 4.13

28

Tirunelveli

20

0.52

18

0.41

13 24.23

29

Tuticorin

11

0.20

10

0.11

7 10.28

30

Kanyakumari

27

0.70

27

0.55

25 51.22

31

Tripur

0

0

23

0.48

23 35.30

Grand Total

463

14.31

446

10.63

442 953.89

Table 1.3.4
Components of repair in the works taken up in Panchayat Union Schools located in Town Panchayats and Third Grade Municipalities under Panchayat Union School Renovation Program in 2008-09 and 2009-2010

Sl  No

Components

2008-2009 2009-2010 2010-2011

Taken up

Amount required (Rs.in crores)

Taken up

Amount required (Rs.in crores)

Taken up

Amount required (Rs.in crores)

1

White /Colour washing of buildings

1452

2.62

1117

2.31

910

2.37

2

Undertaking repairs of RCC roofing of builidngs

663

2.11

520

1.64

456

1.47

3

Repair /Replacement of Damaged  flooring of buildings

726

0.60

501

0.44

423

0.36

4

Painting of Black Boards of buildings

1372

0.29

1033

0.21

857

0.19

5

Repair/Replacement of Doors and Windows

1046

1.13

848

0.85

679

0.66

6

Minor Repairs of damaged tiles/rafters/reapers

207

0.41

183

0.38

148

0.34

7

Repair of cracks in building walls

581

0.27

449

0.26

379

0.21

8

Other works of buildings

1347

1.28

1047

1.05

861

0.89

9

Complete replacement of tiled roofing  of buildings

67

0.71

56

0.40

79

0.69

10

Conversion of Asbestos roofing in to Mangaloe tiled roofing of buildings

284

3.64

189

2.26

134

1.87

11

Construction of Toilets

249

1.25

166

0.83

115

0.52

Total 14.31   10.63   9.57

  Previous Top